Bondstrand™ Butt & Wrap Lamination Pipe Systems
– Successfully Installed on Petronas F12 Platform

MHB of which Malaysia Marine & Heavy Engineering is part of was awarded the Engineering, Procurement, Construction and Commissioning (EPCC) of the WHP topside and jacket, telecommunication and instrumentation system tie-ins of the new F12 platform and telecommunication and instrumentation system tie-ins modification of the existing platform.

The F12 facilities are located in the Kumang Cluster gas fields, 180km north-west of Bintulu, Sarawak in a water depth of 101m.

Related case studies

Looking for more information?